

- #Executive assault 2 mod generator#
- #Executive assault 2 mod full#
- #Executive assault 2 mod software#
500: Order reconstituting the Judicial Nominating Commission and establishi… The Boeing wind turbine research and development program pioneered many of the multi-megawatt turbine technologies in use today, including: steel tube towers, variable-speed generators, composite blade materials and partial-span pitch control, as well as aerodynamic, structural and acoustic engineering design capabilities. It featured the first large-scale variable speed drive train and a sectioned, two-blade rotor that enabled easy transport of the blades. In 1987, the MOD-5B was the largest single wind turbine operating in the world.
#Executive assault 2 mod generator#
Before this decommissioning, the DOE salvaged the drive train gearbox and generator in July 1998.Īlthough Boeing got out of the wind turbine business during the late 1980s and returned to its more traditional products of aircraft and spacecraft, the Boeing-built wind turbines set several world records for diameter and power output. With no prospects for continued operation, Campbell Estates decided to disassemble and scrap the MOD-5B. At that time, due to financial difficulties, the wind turbine was shut down, along with the rest of MUPC, and passed to the property owner, Campbell Estates. (MUPC) and kept in service intermittently until late in 1996.

20, 1987, it completed its first 1,000 hours of operation and had produced enough electrical energy for 1,500 homes.Įarly in 1988, operation of the turbine was transferred to Hawaiian Electric Inc., then to the Makani Uwila Power Corp. At a rotational speed of 17.2 rpm, the blade tip velocity was 206 miles (331 kilometers) per hour.

It operated in winds from 9 to 60 miles (14 to 96 kilometers) per hour and could reach rated power at 7.2 megawatts at wind speeds of 30.6 miles (49 kilometers) per hour.
#Executive assault 2 mod software#
It was entirely automatic, with software changes made using the public telephone system. It weighed 939,000 pounds (425,923 kilograms) and had a 320-foot-diameter (97-meter-diameter) two-blade rotor on a 200-foot (61-meter) steel tower. The next-generation Boeing-built wind turbine, the MOD-5B, was barged to Kahuku on the island of Oahu in Hawaii in 1986 and was running by July 1987. Project manager Peter Goldman called the five-year, $55 million research project "an absolute success." The Medicine Bow MOD-2 wind turbine was sold for scrap metal in 1987 and dynamited over.
#Executive assault 2 mod full#
In 1985, the last full year of operation, the combined electrical output of the three turbines was 8,251 megawatt-hours-enough to power about 1,000 average Northwest homes for a year. The MOD-2 wind turbines of Goodnoe Hills were running through 1986 and then dismantled. The Solar Energy Research Institute also evaluated the suitability of megawatt-size wind turbines as a source of electricity.

The Goodnoe Hills site was primarily a research project for Boeing, Bonneville Power Administration, NASA and Battelle Northwest Laboratories. 2, 1982, the fifth and final MOD-2 began operating at Medicine Bow, Wyo. of San Francisco, and erected it in Solano County, northern California. In April 1982, Boeing completed its first wind turbine for a commercial customer, Pacific Gas and Electric Co. The Bonneville Power Administration bought output of the Goodnoe Hills machines and integrated it into the regional power grid through lines owned by Klickitat County Public Utility District, and the three machines working together became the first "wind farm" in the world. Three were started up during a dedication ceremony May 29, 1981, at Goodnoe Hills, about 13 miles east of Goldendale, Wash. Five turbines, designated MOD-2, went into action during the early 1980s. That same year, Boeing won the NASA and DOE contract for design, fabrication, construction, installation and testing of 2,500-kilowatt wind turbine systems. Its goal was to demonstrate the commercial feasibility of wind power. The federal wind energy system was initiated in 1973 by the National Science Foundation and absorbed in 1977 into the Department of Energy (DOE). took a world leadership role in the design and development of large wind energy systems. During the early 1970s, Boeing Engineering and Construction Co.
